Luis Liu

Luis Liu

CONSTRUCTION MANAGER

Honest and trustworthy, with good psychological quality and the ability to withstand pressure, serious and responsible work, good at innovation. Deeply participated in the Spence project of the company in Chile and won the title of excellent individual of the project.
 
CONSTRUCTION MANAGER
■ CPP North Gas Compression Plants (NGCP) Pipeline Project - Saudi Arabia     
Participated in internal field joint coating as Construction Manager during this project. 
Being familiar with the Aramco Standard, such as SAES-H-201, and familiar with Aramco working procedure.
 
■ Participated Spence Growth Options Project (SGO) in north Chile . 
Participated in the field construction management to be responsible for ensuring the site work be competent to meet requirements on safety,quality, schedule, etc
The SGO project includes the construction of a 155km pipeline system of 36” diameter for transporting of fresh water for a 20-year period from the desalination plant in Mejillones, Antofagasta, to the “Spence” copper mine owned by Minera Spence, a wholly owned subsidiary of BHP, a major mineral resource company based in Australia. 
Pipe Size: Ф910mm   Total length: 153Km   End user: Minera Spence S.A. (BHP);   Contractor: Saipem SpA
Coating type: Pipeline Internal Field Joint Coating used robot; Standard: SGO-NPIW-EXE-CON-MIT-60703.